Machining center spindle restoration for an automotive parts factory
The customer's name is withheld under a confidentiality agreement.
The machining center spindle was vibrating and surface finish was deteriorating; the machine manufacturer quoted a lead time of several weeks to replace the spindle assembly while the line was busy with deliveries.
Our engineers measured vibration to identify the failed bearings and replaced them with a matched pair of ZYS P4 bearings from the same batch, along with seals and grease; followed by dynamic balancing, a stepped-speed run-in and a handover report.
The machine was back in operation in about a day and a half instead of waiting for a new spindle assembly; surface finish and dimensions returned to previous levels. The customer signed an annual maintenance package to keep bearings in reserve.