Integrated robot cells
Robot or cobot, fixtures, safety and controls in one package: design, simulation, fixture manufacturing, robot integration, risk assessment to ISO 13849, PLC/HMI programming, commissioning and operator training.
Challenge & solution
Labor shortage for repetitive tasks: pick-and-place, part feeding, packing, visual inspection across 3 shifts.
Robot cell + vision + quick-change fixtures with changeover in 10 minutes.
Payback in 14–20 months based on actual output and number of shifts; our engineers send the calculation after the site survey.
Quality varies between shifts because of manual handling.
Standardize the process with robots, 100 % camera inspection.
Fewer escaped defects, traceability for every product.
Scope of work
Cycle time measurement, layout, robot reach simulation, feasibility report.
Fixtures, conveyors, electrical cabinet, machine safety; 3D drawings approved before manufacturing.
Machining at the MIKTECH workshop, assembly, robot, PLC, HMI and vision programming.
FAT at our workshop, SAT at your factory, training, documentation, maintenance package.
Deliverables
- Risk assessment file and safety diagram
- Robot, PLC and HMI programs
- Fixture drawings and bill of materials
- Operation and troubleshooting training
FAQ
Cobot or industrial robot?
A cobot when the payload is ≤ 10 kg, speed is moderate and it has to work next to people; an industrial robot when high speed or high payload is needed, with fencing and safety light curtains. MIKTECH calculates based on the actual cycle time.
Related equipment
Need advice for your specific challenge?
Describe the process step, output volume and timeline — MIKTECH engineers respond within 4 working hours.


















