Assembly, inspection and welding jigs

Design and manufacture of fixtures for assembly, inspection and welding: quick positioning, changeover in minutes, poka-yoke checks, sensors confirming part presence. 3D drawings are reviewed with the customer before machining.

1–3 weeksfrom drawing approval to delivery
±0.02 mmpositioning tolerance (reference range)
Poka-yokesensor-confirmed part presence

Challenge & solution

Challenge

A product changeover takes 30 minutes of fixture adjustment, with results varying by operator.

Solutions

Quick-change jig with locating pins, quick clamps and model-specific change plates.

Results

Changeover in under 5 minutes, pin-based repeatability, no dependence on operator skill.

Challenge

Welding distortion and misplaced welds.

Solutions

Welding jig with pneumatic clamps, copper heat-sink plates and a rotating fixture.

Results

Consistent weld positions, less rework after welding.

Scope of work

01Requirement intake

Product drawing or sample, process step, quantity, takt time.

023D design

Reviewed with the customer: clamps, pins, sensors, changeover plates.

03Machining & assembly

Precision parts made at the MIKTECH workshop, assembly, acceptance to drawing.

04Handover

Inspection report, user guide, replacement parts (pins, clamps).

Deliverables

  • 3D/2D fixture drawings
  • Inspection report
  • Consumables list

Related equipment

Made to order
MHZ2-16D Parallel gripper cylinder Ø16, double acting Price: Contact
Made to order
CQ2B32-50DZ Compact square cylinder Ø32, 50 mm stroke, double acting Price: Contact
In stock
AGKB-M0524P1 M5 inductive proximity sensor, PNP NO, 3-wire Price: Contact
In stock
BS5-Y1M-P Y-type photomicro sensor, 5 mm slot, PNP Price: Contact

Need advice for your specific challenge?

Describe the process step, output volume and timeline — MIKTECH engineers respond within 4 working hours.