Modular MES

Manufacturing execution in modules rolled out step by step: production orders, progress tracking, quality, traceability, maintenance, energy. Start with the most painful module and expand once the team is used to the data.

Modulestep-by-step rollout
6–12 weeksfirst module
ERPorder and result sync

Challenge & solution

Challenge

Production progress is reported in Excel at the end of the day, too late to react.

Solutions

Progress tracking module per production order, updated from machines and barcode scanning stations.

Results

Hourly progress visibility and timely dispatching.

Challenge

Customer audits require traceability.

Solutions

Traceability module linking materials, process steps and inspection results to each unit.

Results

Trace a lot in minutes.

Scope of work

01Process survey

Map of current data flows and pain points.

02Priority module

Progress, quality, traceability or maintenance.

03Integration

Machines, scanning stations, ERP.

04Expansion

Add modules along the roadmap.

Deliverables

  • Process and data map
  • MES modules in operation
  • ERP integration protocol

Related equipment

Made to order
NX1P2-9024DT NX1P2 machine automation controller, 40 I/O, EtherCAT, 4 axes Price: Contact
Made to order
BJ15M-TDT Through-beam photoelectric sensor, 15 m, NPN/PNP, M18 rectangular Price: Contact

Need advice for your specific challenge?

Describe the process step, output volume and timeline — MIKTECH engineers respond within 4 working hours.