Molds and fixtures
Design and manufacture of stamping dies, simple injection molds and clamping systems for machining, assembly and inspection. Repair and refurbishment of existing molds.
Challenge & solution
An old mold is worn, parts have burrs, and waiting for the manufacturer to repair it takes too long.
Measure the mold, replace inserts, regrind the cutting faces, run a mold trial.
The mold is running again within 1–2 weeks.
Workholding is needed for batch machining on CNC machines.
Multi-position hydraulic/pneumatic fixtures with standard locating pins.
Shorter setup time, more parts per run.
Scope of work
Product, machine, volume, condition of the existing mold.
3D mold/fixture design, simulation when needed.
Machining, heat treatment, assembly, mold trial, adjustment.
Drawings, mold maintenance instructions.
Deliverables
- Complete mold / fixture
- Drawings and wear parts list
- Approved trial samples
Related equipment
Need advice for your specific challenge?
Describe the process step, output volume and timeline — MIKTECH engineers respond within 4 working hours.















