SOLUTIONS & SERVICES
Factory solutions, technical services and manufacturing
32 solutions, from machine building, jigs and robot cells to maintenance contracts. On-site factory survey, concept within 1–2 working days.

32 solutions, from machine building, jigs and robot cells to maintenance contracts. On-site factory survey, concept within 1–2 working days.
Solutions
Custom machine building
8–16 weeks from concept approval to SAT Details →
Solutions
Integrated robot cells
6–10 weeks from survey to commissioning Details →
Solutions
Assembly and inspection lines
8–14 weeks design to SAT Details →
Solutions
Camera and sensor inspection systems
≥ 0.2 mm defects detected consistently (depending on lens) Details →
Solutions
Production line improvement
2–6 weeks per improvement item Details →
Solutions
SCADA and production dashboards
4–8 weeks modular rollout Details →
Solutions
SCADA
4–8 weeks modular rollout Details →
Solutions
Modular MES
Modular step-by-step rollout Details →
Solutions
Traceability
Forward & backward from materials to products and back Details →
Solutions
Production dashboard
Real time shop-floor screens and phones Details →
Solutions
Maintenance management
MTBF · MTTR per machine Details →
Solutions
Energy monitoring
kWh / product specific consumption per machine Details →
Solutions
Machine data connectivity
OPC UA · Modbus · MTConnect protocols Details →
Solutions
Modular MES and traceability
Details →
Services
Machine installation
24 hours installation scheduling response Details →
Services
Production line relocation and setup
Plan machine by machine, day by day Details →
Services
Repair and maintenance
4 hours response when a machine is down Details →
Services
Equipment overhaul
2–6 weeks depending on the machine Details →
Services
On-site factory engineers
Weekly / monthly flexible duration Details →
Services
Long-term maintenance contracts
3 packages Basic · Standard · Comprehensive Details →
Tooling
Assembly, inspection and welding jigs
1–3 weeks from drawing approval to delivery Details →
Tooling
Precision machine parts
CNC milling – turning – grinding – wire EDM Details →
Tooling
Molds and fixtures
2–6 weeks new molds and fixtures Details →
Tooling
Replacement spare parts
2 options remanufacture or supply an equivalent Details →
Tooling
Reverse engineering
3D modeled from the sample Details →
Equipment
Industrial sensors and cameras
Details →
Equipment
PLC, HMI, servo and inverter (VFD)
Details →
Equipment
Machine safety devices
Details →
Equipment
Robots and cobots
Details →
Equipment
Measuring instruments
Details →
Equipment
Pneumatic and mechanical components
Details →
Equipment
Selected specialized machinery
Details →
Describe the process step, output volume and current layout — MIKTECH engineers propose an approach after a site survey.